A contract was awarded to Stewart & Tate to micro-surface Rexwood Drive in 2016. They patched the street then did the micro-surfacing. This process is cheaper than repaving and is intended to extend the life of the street.
The Micro-Surfacing was completed however, through the winter the material has cracked. Stewart & Tate says the performance of the material is as expected. No further repairs will be made at this time.